How Watlow Cut RFQ Time with AI Sourcing Agents
How Watlow, the St. Louis industrial heating maker, put Paperless Parts' Radar on drawings scattered across Macpac, Oracle, and the PLM systems, and cut a sourcing action from 4–5 weeks to 2–3 days. The 80% and the 35% are the vendor's case study. The instruction file is the sourcing desk a smaller plant can run.
Read more